Project Overview
A temporary infrastructure solution was required to support pipeline installation activities for a new residential subdivision. The project involved the design and construction of a short access roadway and a reinforced staging pad to safely accommodate mobile pipeline trailers during construction.
Scope of Work
- Designed a short access road to provide reliable entry for heavy construction vehicles and trailers.
- Constructed a load-bearing pad engineered to support the storage and staging of mobile pipeline trailers.
- Ensured compatibility with subdivision layout and minimized impact to surrounding undeveloped lots.
Engineering Considerations
- Evaluated soil conditions and traffic loading to determine appropriate subgrade preparation and pad thickness.
- Designed the roadway and pad to withstand repeated heavy equipment loads.
- Incorporated drainage considerations to prevent water accumulation and maintain pad stability.
Outcome
The completed roadway and staging pad provided a stable, safe, and efficient area for mobile pipeline trailer storage, enabling uninterrupted pipeline construction while supporting the overall development schedule of the residential subdivision.